  How are the installed
 
 

Splash Board Install

Perma-Columns require the splash board to be attached using a pre drilled concrete nail. To do this, drill a 3/16" hole through the splash board into the concrete post 2" using a hammer drill. Angle the drill toward the center of the concrete post to avoid hitting the interior rebar. Drive a 3/16" x 3" Powers galvanized steel split drive anchor (PC3DA-HDG) into the post until the skirt is secure.

WARNING: Avoid using concrete screws & concrete nail guns because most are not designed for high strength concrete and result in screws being stripped, heads twisting off, or surface chipping.

Split Drive Install Dimensions

Option 1: Assembled Installation
Option 2: Unassembled Installation
Splash Board Installation

 

 

 
 
Perma Column Accessories Perma-Column Downloads Perma-Column Frequently Asked Questions Store
© Copyright 2009 Perma-Column. All Rights Reserved.
400 Carol Ann Lane Ossian, IN 46777
Phone (800) 622-7190  |  sales@permacolumn.com
How Perma=Columns are made Are Perma-Columns strong enoughWhat are Perma-Columns